Start time: July 2018
Completion time: September 2018
Project introduction: The original 230kVkV Barisel line of the Bangladesh National Grid has tower bases T29-T31. One of the lines is unloaded to a temporary transition pole to reduce the tower load. The scope of the project includes the reconstruction of a 615-meter line. Emergency repair project of Sanji temporary transition rod.