Barisal 350MW coal-fired power station 400kV transmission line project
Start time: January 2020 Completion time: April 2022 Project Introduction: The supporting 400kV transmission line of Barisa 350MW coal-fired power station. The project starts from the Barisa 350MW coal-fired power station under construction, with a route of about 28 kilometers, and is connected to the GIS switch station of the Pajala coal-fired power station.
Start time: January 2020
Completion time: April 2022
Project Introduction: The supporting 400kV transmission line of Barisa 350MW coal-fired power station. The project starts from the Barisa 350MW coal-fired power station under construction, with a route of about 28 kilometers, and is connected to the GIS switch station of the Pajala coal-fired power station.