Start time: July 2005
Completion time: March 2007
Project introduction: The 130MW combined cycle barge power station in Baghbari, Bangladesh, is divided into two phases. The first phase is a 96MW single-two 251B gas turbine, and the second phase is a 50MW Japanese Mitsubishi steam turbine. The scope of the project covers the whole process of BOP general contracting, design, supply, civil engineering, installation, commissioning and quality assurance handover except the main engine boiler.