Start time: October 2005
Completion time: December 2006
Project introduction: The technical transformation project of the 70MW diesel engine power station in Brahmala, Bangladesh covers the fuel system, fire protection system and lubricating oil system. Fujian Electric Power Construction provides the whole process of EPC services in design, supply, construction and commissioning.