Bangladesh Barisel-Bora-Bohanuddin 230kV double-circuit transmission line cross-river turnkey project
Start time: August 2018 Completion time: January 2020 Project introduction: The original Barisa-Pola 230kV cross-river line in Bangladesh is located in the river scouring area all the year round, and the foundation is seriously corroded. The cross-river line needs to be rebuilt. This project includes the design, procurement and Construction turnkey project.
Start time: August 2018
Completion time: January 2020
Project introduction: The original Barisa-Pola 230kV cross-river line in Bangladesh is located in the river scouring area all the year round, and the foundation is seriously corroded. The cross-river line needs to be rebuilt. This project includes the design, procurement and Construction turnkey project.