Start time: November 2019
Completion time: September 2020
Project introduction: There is a new 50MWac photovoltaic power station in Mymensingh, Bangladesh. The scope of the project covers the procurement and construction subcontracting of the 132kV transmission line of the photovoltaic power station and the expansion of the opposite substation.