Start time: January 2018
Completion time: July 2018
Project introduction: Two 230kV double-circuit lines on the same tower belonging to the Bangladesh National Grid Corporation (PGCB) crossed the land of the Dasher Gandhi sewage treatment plant in Bangladesh, which affected the layout and construction of the plant area and required relocation Reconstruction, our company undertook the relocation and renovation project of two 230kV double-circuit lines in the sewage plant area with the EPC general contracting mode, and built a total of 8 base corner towers, with a total length of about 2km.