Start time: December 2019
Completion time: April 2020
Project introduction: The 230kV transmission line project for the Mirsale Power Station in Bangladesh. The line starts from the portal frame of the booster station of the Mirsale Power Station and ends at the portal frame of the PGCB 230kV Mirsale Substation. The new line is 1.51km long and adopts double circuits Erection.