230kV Transmission Line Construction Project of 150MW Dual Fuel Power Plant Project in Mirsale, Bangladesh
Start time: December 2019 Completion time: April 2020 Project introduction: The 230kV transmission line project for the Mirsale Power Station in Bangladesh. The line starts from the portal frame of the booster station of the Mirsale Power Station and ends at the portal frame of the PGCB 230kV Mirsale Substation. The new line is 1.51km […]
Start time: December 2019
Completion time: April 2020
Project introduction: The 230kV transmission line project for the Mirsale Power Station in Bangladesh. The line starts from the portal frame of the booster station of the Mirsale Power Station and ends at the portal frame of the PGCB 230kV Mirsale Substation. The new line is 1.51km long and adopts double circuits Erection.